| No | Deskripsi | Kuantitas | Harga | Subtotal Baris | Total Disimpan | Potongan Item (Hitung) | Aksi |
|---|---|---|---|---|---|---|---|
| 1 | Terop 6 lokal x 4 Hari | 24.00 | Rp 350.000 | Rp 8.400.000 | Rp 8.400.000 | Rp 0 | |
| 2 | LCD Proyektor 1 Unit x 4 Hari | 4.00 | Rp 300.000 | Rp 1.200.000 | Rp 1.200.000 | Rp 0 | |
| 3 | Bloking Kain 24 Meter x 4 Hari | 96.00 | Rp 20.000 | Rp 1.920.000 | Rp 1.920.000 | Rp 0 | |
| 4 | Terop (Tambahan di SMP) | 5.00 | Rp 350.000 | Rp 1.750.000 | Rp 1.750.000 | Rp 0 |
| Subtotal | Rp 13.270.000 |
|---|---|
| Total Potongan | Rp 0 |
| Grand Total | Rp 13.270.000 |